Putting SPIDER together

spider_gettingthere

And this is what things look like now. The cryostat mounted to the gondola, the gondola suspended from the ropes and pivot controller on the hoist (this will be the eventual connection point to the balloon flight train) and the sun shields ready and waiting for installation.

Bookmark the permalink.